[1] Zhang Lianying, He Jing, Zhang Xinxing. The Project Management Maturity Model and Application Based on PRINCE2. Procedia Engineering, 2012,Vol.29, 3691-3697.
[2] Lianying Zhang, Qiong Wu, Chen Chen and Yan Yue. Solution for the Nonlinear Multi-Objective Model in Construction Projects Using Improved Particle Swarm Optimization. Research Journal of Applied Sciences, Engineering and Technology, 2012,4(19):3565-3573.
[3] Lianying Zhang, Yuan Gao. Safety Culture Model and Influencing Factors Analysis in Construction Enterprises of China. Research Journal of Applied Sciences, Engineering and Technology, 2012,4(18):3297-3312.
[15] Zhang Lianying. Analysis of the Diversity of Population and Convergence of Genetic Algorithms based on Negentropy.系统工程与电子技术(英文版),2005,Vol. 16,No.1,215-219.